动臂塔式起重机利勃海尔

500 HC-L 16

L U F F I N G B O O M T O W E R C R A N E

stationary and travelling

Morrow Equipment

Hook Heights

10m 33 ft

5m 16 ft

0 5m 16 ft

10m 33 ft

15m 49 ft

20m 66 ft

25m 82 ft

30m 98 ft

35m 115 ft

40m 131 ft

500 HC-L 16

45m 148 ft 50m 164 ft 55m 180 ft 60m 197 ft

(70m)

(65m)

(55m)

(60m)

(50m)

(45m)

(40m)

(35m)

(30m)

(25m)

(20m)

(15m)

(10m)

(5m)

NOTE! By combining information from the graph above with data from the tower height chart on the adjacent page, hook heights can be deter-mined. It will be necessary to select boom length, boom angle and tower configuration. Contact Morrow for additional information.

Morrow Equipment Co., L.L.C.

D i r e c t i o n o f b o o m

500 HC-L 16

➜w h e n c l i m b i n g .

PLAN VIEW – showing tail swing radius and minimum clearance.

with 500 HC-L Tower Section

on concrete slab

with 500 HC-L Base Section

on concrete slab

T0WER HEIGHTS*

NOTE! Information regarding crane equipped for rail travelling is available. Consult operation manual or contact Morrow.

Morrow Equipment Co., L.L.C.

500 HC-L 1

6

maximum tower with 131 ft (40m)

boom installed*

Configuration Iwith 500 HC-L tower

FREESTANDING

stationary

*NOTE! Tower configurations illustrated above apply to cranes in which the "out of operation" boom angle is set at 70°. If the "out of operation" boom position is set at 15°, up to 2 additional tower sections may be added to tower configura-tion I, II and III. Consult operation manual. Contact Morrow for information regarding alternate tower configurations. Restrictions may apply.

Morrow Equipment Co., L.L.C.

Capacities

500 HC-L 16

70,550 lbs61,730 lbs52,910 lbs44,090 lbs35,270 lbs26,460 lbs17,640 lbs8,820 lbs70,550 lbs61,730 lbs52,910 lbs44,090 lbs35,270 lbs26,460 lbs17,640 lbs8,820 lbs70,550 lbs61,730 lbs52,910 lbs44,090 lbs35,270 lbs26,460 lbs17,640 lbs8,820 lbs15m 20m 25m 30m 35m 40m 45m 50m 55m 60m

Morrow Equipment Co., L.L.C.

IMPORTANT! crane.

500 HC-L 16

NOTE!

D i r e c t i o n o f b o o m NOTE! †

Contact Morrow for additional information regarding dimensions, alternate tower configura-tions, reactions forces, tie-in installation and slab opening requirements.

TOP CLIMBING

with 500 HC-L Tower

tied to structure

Morrow Equipment Co., L.L.C.

Hoist Speed and Capacity

500 HC-L 16

IMPORTANT! The data below applies only to crane serial no. 29.194

NOTE! Capacities and line speeds indicated will vary depending on the amount of hoist rope installed. This crane model may be equipped with a hoist unit other than that specified in the data above. To verify, check the serial number of the crane and refer to the Liebherr 500 HC-L 16 Operation Manual for additional information. One-part line operation is not available with crane serial number 29.194.

Motor Information

NOTE! Luffing speed figure above is for crane without load. Speed varies according to load on hook.

Power Requirements

Static: 480 Volts — 3-phase — 60 Hz — 350 Amperes — 245 kVATravelling: Information available upon request.

Specifications subject to change without prior notice. For additional information, contact Morrow Equipment.

Morrow Equipment Co., L.L.C.

500 HC-L 16

Slewing Assembly (Complete) includes turntable, swing motors, slewing ring and slewing ring support. Climbing shoes are detachable: add 800 lbs (365 kg) each for the two front shoes and 1,000 lbs (454 kg) each for the two back shoes, i. e., 3,600 lbs (1 638 kg) total. Dimensions and weight above do not include climbing shoes.2

Slewing Assembly Upper Part includes turntable and swing motors. Does not include slewing ring or slewing ring support.3

Slewing Assembly Lower Part includes slewing ring and slewing ring support. Does not include turntable or swing motors. Climbing shoes are detachable: add 800 lbs

(365 kg) each for the two front shoes and 1,000 lbs (454 kg) each for the two back shoes, i. e., 3,600 lbs (1 638 kg) total. Dimensions and weight above do not include climbing shoes.4

Machine deck can be split into two (2) parts: Inner part at 24,000 lbs (10 880 kg) and Outer part at 11,230 lbs (5 090 kg). 5

Does not include wire rope.6

A-frame (Complete) includes A-frame Part A, A-frame Part B (2 each), back stays (2 each), ladder and platforms.7

Ballast Rocker Assembly (Complete) includes Ballast Rocker Strut (2 each), ballast carrier and connecting rods (2 each).8

Can be broken down into two panels.9

Boom Assembly Part 1 includes Boom Butt Section, one Intermediate Section (621) and erection wire rope.10

Boom Assembly Part 2 includes boom sections and pendent bars. Does not include hoist wire rope or hook block.

1

O M P A N Y, L. L. C.

Atlanta, GA • Charlotte, NC • Chicago, IL • Dallas, TX • Denver, CO • Honolulu, HI • Houston, TX • Los Angeles, CA Las Vegas, NV • Millwood, NY • Pensacola, FL • St. Louis, MO • San Francisco, CA • Salem, OR • Seattle, WA • Miami, FL • Tampa, FL Washington, DC • Sydney, Australia • Wellington, New Zealand • Vancouver, BC, Canada • Toronto, ON, Canada • Mexico City, Mexico

Printed in the USA

MEC - 500HCL16 - rev2 - 0205 - PDF


相关文章

  • 施工用大型机械设备施工方案
  • 大型施工设备施工方案 一.一般规定 1各类垂直运输机械的安装及拆卸,应由具备相应承包资质的专业人员进行,其工作程序应严格按照原机械图纸及说明书规定,并根据现场环境条件制定安全作业方案. 2 新安装的垂直运输机械,在交付使用前,应按有关标准进 ...

  • 塔式起重机安全事故及隐患分析和预防
  • 塔式起重机安全事故及隐患分析和预防 近年来,随着城市建设的快速发展和高层建筑物的增加,塔式起重机的使用越来越普及,重大伤害事故的发生率也在不断提高.安全性是塔式起重机的重要性能之一,由于它对建筑行业的影响,因此对其安全性的要求也愈来愈高,我 ...

  • 特种设备备案流程2
  • 福建东侨经济开发区建设工程安全监督站 建筑工程特种机械使用登记备案流程 一.建筑起重机械安装(拆卸)告知 建筑起重机械安装.拆卸前,安装单位应办理建筑起重机械安装(拆卸)告知手续.各建筑垂直运输设备安装(拆卸)告知手续经福建东侨经济开发区建 ...

  • 起重机吊臂架调研报告
  • 调 研 报 告 主题:单臂吊臂架的钢结构调研报告 系 (院) 专 业 机电一体化 学 号 学 生 指导教师 2012年 3 月 2 日 单臂吊臂架的钢结构调研报告 一.课题意义 通过对该课题的研究,可以对我在本科期间的所学知识进行一个全面的 ...

  • 塔式起重机安全技术控制措施
  • 塔式起重机安全技术控制措施 1.起重机的路基和轨道的铺设,必须严格按照原厂使用规定或符合以下要求: (1)路基土壤承载能力中型塔为8-12t/m2,重型塔为12-16t/m2: (2)轨距偏差不得超过其名义值的1/1000: (3)在纵横方 ...

  • 塔吊报审表
  • 三明市清流县元鸿广场项目 塔 式 起 重 机 安 装 告 知 表 福建省富林建设工程有限公司 目 录 1.真实性承诺书 2.建筑起重机使用登记申请表 3.起重机械安装(拆卸)告知表 4.建设工程机械安装质量检测合格证 5.检测报告 6.检测 ...

  • 塔吊司机安全教育
  • 塔吊司机安全教育 操作前检查 1.上班必须进行交接班手续,检查机械履历书及交接班记录等的填写情况及记载事项. 2.检查各主要螺栓的紧固情况,焊缝及主角钢无裂纹.开焊等现象 3.检查机械传动的齿轮箱.液压油箱等的油位符合标准. 4.检查各部制 ...

  • 起重机械安装改造维修许可规则
  • TSG特种设备安全技术规范TSGQX00X-2012 起重机械安装改造维修许可规则 CraneInstallation,Alteration,Repair&Maintenance LicensingRegulation (征求意见稿 ...

  • 塔吊臂杆相遇垂直高度错开的施工方法
  • 2010年第2期 新疆钢铁 总114期 塔吊臂杆相遇垂直高度错开的施工方法 邹文明 (新疆冶金建设公司) 摘 要: 介绍某住宅小区1号-7号住宅楼同时施工,根据施工需求需安装3台塔吊才能满足施工作业面,塔吊:臂杆:臂长:作业 文献标识码:B ...

© 2024 范文参考网 | 联系我们 webmaster# 12000.net.cn